PML 79

Apani Field

Onshore field with an installed EPF, gas plant and CNG compression, commissioning towards production.

Licence
PML 79
Interest
100%
Operator
Stage
Commissioning towards production
Location
Niger Delta, Rivers State
Terrain
Onshore
Discovered
1980
Awarded
2020 Marginal Field Bid Round

Apani · PML 79

Working interest
100%
Operator
Apani Energy Limited (AEL)
Work programme
Commissioning towards production
Stage
Development
Location
Niger Delta, Rivers State · Onshore
NigeriaPPL 211PPL 207OPL 2010
PML 79Apani
KeyProductionDevelopmentExplorationPositions are indicative

Overview

Apani Field is an onshore asset in the Niger Delta, Rivers State. The field was discovered in 1980 and subsequently awarded to Matrix Energy Group through the 2020 Marginal Field Bid Round.

AEL has advanced the redevelopment of Apani through an extensive drilling, facilities and infrastructure programme. The Company re-entered, sidetracked and completed Apani-01ST as a dual producer in 2023, following the drilling of Apani-02.

AEL has established gas commercialisation arrangements through a Gas Sales Agreement with Indorama Petrochemicals and a CNG offtake arrangement with Matrix Energy Limited.

These infrastructure and commercial arrangements position Apani for near-term production and provide opportunities for future development synergies with nearby stranded fields.

15 MMscf/d

Gas — stated facility capacity

1,200 bopd

Oil — stated facility capacity

7.5 km

Gas pipeline to Indorama

Field timeline

Apani, built up year by year

From discovery onshore in Rivers State to PML 79: wells, approvals, surface facilities and the gas pipeline to Indorama. Scroll to turn the dial; the drawing builds with each milestone. Illustrative, not to scale.

1980202020232024FacilitiesPipeline20261980Discovery
1 / 7
DrilledProducing
1 well drilled1 of 7
1980 · Discovery

Apani Field is discovered

Apani Field is discovered, onshore in the Niger Delta, Rivers State.

Milestones

  1. 1980

    Apani Field discovered.

  2. 2020

    Awarded to Matrix Energy Group through the Marginal Field Bid Round.

  3. 2023

    Apani-02 drilled; Apani-01ST re-entered, sidetracked and completed as a dual producer.

  4. 2024

    Field Development Plan approved by NUPRC.

  5. 2026

    Asset converted to PML 79. Facility commissioning in progress towards production.

Facilities and arrangements

  • Early Production Facility (EPF)
  • Gas Processing Plant (GPP)
  • CNG compression facilities
  • 7.5 km gas pipeline and metering station to the Indorama tie-in point
  • Gas Sales Agreement with Indorama Petrochemicals
  • CNG offtake arrangement with Matrix Energy Limited
Apani surface facilities
Apani surface facilities
Map locating Apani Field among neighbouring licences
Apani Field location